Open RAN and 5G CPE: What Interoperability Testing Must Cover

News featured image

An operator can deploy a multi-vendor radio access network while using ordinary standards-based customer devices. CPE evaluation should identify the network and radio features actually required, rather than treating an Open RAN label as a new universal customer-device interface.

Correctly identify the interface

O-RAN ALLIANCE’s Open Fronthaul work concerns the interfaces between radio-access infrastructure functions such as the O-DU and O-RU. A customer CPE connects through the cellular radio interface. It is not normally an O-DU or O-RU and should not be required to implement infrastructure fronthaul solely because the serving network uses Open RAN.

Build a concrete capability matrix

Ask the operator which bands, network modes, carrier combinations, voice features and mobility behaviour are required. Identify any optional features being trialled. The network’s equipment release does not establish which functions a specific CPE modem, radio implementation and firmware support.

Test the intended service

  • Registration and authentication using the intended SIM and service plan.
  • Data-session establishment, APN settings and addressing requirements.
  • Uplink, downlink, latency and loss across representative radio conditions and network load.
  • Cell reselection, recovery from service interruption and required mobility scenarios.
  • Voice or special service features only where explicitly included in the project.

Record the network configuration, device variant and firmware for each result. Repeat relevant tests after material network or device changes. Successful attachment in one lab does not establish compatibility across every commercial deployment.

Ask for useful evidence

Use operator acceptance records or a jointly agreed test report that identifies the actual equipment and test scope. Do not interpret participation in a general industry event, a chipset feature list or a supplier’s infrastructure partnership as approval of a particular retail CPE model.

For procurement, share the target operator and deployment configuration with the supplier. The appropriate outcome is a versioned, testable compatibility statement and a defined support path.

Related product and planning resources

Sources and further reading