Choose a CPE manufacturing partner by testing the ability to deliver the agreed device and maintain it through its lifecycle. Use the same written brief for candidates so that differences in scope, configuration and support remain visible.
Fourteen questions for supplier qualification
- Engineering ownership: who owns radio, firmware, enclosure and test decisions, including outsourced work?
- Reference configuration: what exact hardware and firmware are offered for evaluation?
- Network qualification: which operator requirements and test scenarios have been demonstrated?
- Approval evidence: do the relevant documents identify the intended model, configuration, holder and scope?
- Production control: how are versions, traceability, calibration and assembly instructions controlled?
- Acceptance testing: what measurable checks distinguish an approved sample from a production lot?
- Change management: what notification and requalification process applies to component or software substitutions?
- Firmware support: how are updates, recovery and security issues handled?
- Customization scope: which branding, interface, packaging and software work is included?
- Project coordination: who approves specifications, milestones and changes?
- Supply planning: what quantities, dependencies and lead-time assumptions are covered by the current quotation?
- Commercial responsibilities: what tooling, licensing and support costs are separate from the unit price?
- Returns and field support: how are faults investigated and replacement arrangements documented?
- End-of-life planning: what notification, last-order and software-maintenance commitments are agreed?
Use documents and demonstrations together
Request a configuration-controlled sample, relevant reports and a test session that exercises important requirements. Staff headcount or a factory photograph is not a universal proxy for product quality. An organisation-level certificate does not establish every device’s approval.
Release work in stages
Separate requirements review, engineering sample, pilot deployment and production acceptance. Name the evidence and approval owner for each stage. Keep deviations visible and obtain agreement before a different component or firmware build is shipped.
Prepare a comparable quotation request
Provide target countries and operators, installation format, quantities, interfaces, management needs and required customization. Ask each candidate to distinguish delivered functionality from optional work or roadmap proposals. Compare the total agreed scope rather than headline prices alone.
Use the shorter distributor checklist when preparing a product handover. For a specific Honlly device, use its current specification and confirm the quoted configuration.

